Facilities
The design stage of the school was heavily iterated. The team held ‘barazas’ (village meeting) with the community, whereby the community provided their design ideas along with their vision for the school. The team then worked with an assigned Architect (from the Kilifi County), Structural Engineer and Quantity Surveyor to ensure that the school was designed in accordance to the Ministry of Education’s School of Excellence requirements.
The Master Plan accommodates 540 students.
Phase 1 Facilities
fundraising complete, construction in progress. opening in january 2024.
6 Classrooms
Each Classroom is designed to have a capacity of 45 students.
1 Classroom Block = 3 Classrooms
2 Science Labs
Each Science Lab has a lab, office and a preparation lab.
1 Science Block = 2 Science Labs
Admin Centre
The Admin Block consists of a Staffroom, offices for the Head Teacher, Deputy Head Teacher, Heads of Departments (HOD), the Head Accountant as well as washroom facilities.
Resource Centre
The Resource Centre includes a Library Hall, Computer Lab, Librarian’s Office, Computer Instructor’s Office, and a store.
Phase 2 Facilities
fundraising in progress.
6 Classrooms
Each Classroom is designed to have a capacity of 45 students.
1 Classroom Block = 3 Classrooms
Water harvesting
Rain water harvesting system on the roof. Borehole with a solar-powered pump, and 2 10,000 litre tanks.